CHEMICAL INVESTORS RELATIONS
C.10 FORMALDEHYDE PLANT ( Patancheru,IDA phase IV)
- Formadehyde manufacturing plant of capacity 25 tons per day using Silver catalyst
- Set up new in the year 1995.This plant stopped in April 2011.Running to full capacity with
A conversion ratio of Methanol to HCHO as 2:1
- It is equipped with all storage tanks for Methanol and Formaldehyde.
- This plant was set up in 1995 and stopped working in April,2011
C.11 RESIN PLANT ( Patancheru,IDA phase IV)
Reaction kettles with all required equipment like Condenser,Distillate tank,daily tank,storage tanksetc
: 2nos
: 2500 litre and 3000 litre Batch
Steam Boilers of capacity
: 2.0 tons per hr. & 1.0 ton per hr
Deisel Generators of capacity
: 250 and 125 KVA
The Resin plant was set up in 1983 & 1995 and stopped working in April 2011
Photo Gallery
C 10 HCHO PLANT
C 10.1 HCHO CONTROL PANEL
|